矿柱英语怎么说
本文为您带来矿柱的英文翻译,包括矿柱用英语怎么说,矿柱用英语怎么说,矿柱的英语造句,矿柱的英文原声例
本文为您带来矿柱的英文翻译,包括矿柱用英语怎么说,矿柱用英语怎么说,矿柱的英语造句,矿柱的英文原声例句,矿柱的相关英语短语等内容。
矿柱的英文翻译,矿柱的英语怎么说?
ore pillar ; jamb ; ore column ; mine prop ; pillar ; mine pillar ; ore column
矿柱的英语网络释义
矿柱的汉英大词典
矿柱
- mine prop; pillar; post; stump; rib; jamp
- 短语:
- 矿柱巷道 {采矿} pillar split;
- 矿柱回采 pillar recovery;
- 矿柱强度 pillar strength
矿柱的英语短语
倾斜矿柱[矿业]slope pillar
保安矿柱safety pillar;obstructive ridge
回采矿柱robbing;pillar robbing;abstractionofpillar
支承矿柱support pillar
防水矿柱water barrier;ore Pillar preventing water burst;Water Proofing Pillar;water protecting pillar
平巷矿柱drift pillar
阶段间矿柱floor pillar;crown pillar
井筒保安矿柱[矿业]shaft pillar
分界矿柱[矿业]boundary pillar
窄矿柱rance
矿柱的英文例句
如果不采矿柱矿山经济效益将急剧滑坡。
If the jamb - mine isn't exploited, the economic benefit will go down rapidly.
小矿房、小矿柱的房柱法。
Room-and pillar mining method with small room and pillar.
这一技术叫矿柱回采。
This technique is known as robbing.
矿柱的稳定性是影响矿山生产安全的重要因素。
The stability of pillars is a very important factor to mining safety.
用尾砂分层充填法回采矿柱,取得了很好的经济效果。
Excellent results were obtained in mining of pillars using tailings in horizontal cut-and-fill.
两队机枪兵应该保护游戏玩家你的矿柱免受蜂群的袭击。
The 2 Riflemen should protect your Tiberium Spike from Buzzer attacks.
他们有多种用途,比如侦察,反步兵清建筑或是快攻矿柱。
There are many ways of using them such as Scouting, Anti-Infantry clearing structures or rushing Tiberium Spikes.
本文论述胶结充填人工矿柱(壁)在一定条件下的承载作用。
In this article, the supporting behavior of cemented backfill rib pillars under certain circumstances are discussed.
介绍了含砷低品位硫化铜矿柱浸实验研究方法、装置和结果。
The method, experimental equipment and results of column leaching were presented for low-grade copper sulfide ore.
顶板冒落、巷道底鼓和矿柱破坏是采矿过程中的重要岩石力学问题。
Roof falling, floor heave of roadway and pillar failure are important problems of rock mechanics in mining process.
壁式无矿柱采矿首先是在煤矿推行,金属矿还未实现壁式无矿柱采矿。
The method of wall mining without pillars was first used in coal mine. In the metal mine it has not been used yet.
本文提出了一种矿房矿柱阶段性连续回采,深孔放顶处理空区的采矿方法。
This paper introduced a new method for it, ie continuous stoping of room and pillar in stages and to fill mined bed with falling roof by deep-hole blasting.
必要的:一队机枪兵派到你的地堡,一队去另一个地堡,破坏者去你的矿柱。
Necessary: one Riflemen to your bunker, one to the other bunker, Saboteur to you Tiberium Spike.
一次钻孔分段爆破的新工艺已成功地应用到天井掘进和矿房、矿柱的回采方面。
A new technique of the long-hole blasting has been used in raising and prospecting of the rooms and the pillars.
在空区未充填的情况下回采矿柱,矿柱与采空区顶板的稳定性是一个关键问题。
The stability of the ore pillar and the roof is a key issue in the pillar recovery in unfilled mined-out area.
采空区上部预留矿柱的回采工作影响到整个矿山的安全生产、采矿方法及其实施。
Mining the ore in pillars above the mine-out area comes down to the security of production, mining methods and putting in practice.
采用孔径变形应力解除法,测量了某大型磷矿采空区中矿柱结构的应力分布规律;
The stress relief method of hole diameter deformation was used to measure the stress distribution of the pillar structure in the mined area in a big phosphate mine.
对于阶段空场法,采矿系统设计主要包括采场结构参数、矿柱大小、回采顺序等。
To block stoping, mining system design mainly includes design of block parameter, design of pillar's dimension, design of ore drawing sequence.
先房后柱的上向分层胶结充填法在我国应用较为广泛,但矿柱后期回采条件较差。
The practice cf mining room first and then pillars by overhand cut and cemented fill is widely used in China, but the condition for pillars recovery in later period is normally worse.
根据数值计算的结果,并结合矿山现场的实际情况,确定矿柱回采试验的最终方案。
According to the numerical results and the states of the mining filed, the final mining method of ore-pillar recovery is determined.
通过对埋设于570中段光弹性应力计的观测,分析了该中段矿柱破坏的情况及原因。
The cause of mine pillar destruction in in Dachang Tongkeng Tin Mine was analyzed from observation by photoelastic stressmeter embedded in mine stope 570.
深部水平矿柱开采的稳定性问题,是地下金属矿山迫切需要解决的共性技术难题之一。
The stability of horizontal pillars in deep mining is one of the common technical challenges that should be solved urgently for underground metal mines.
本文以平邑石膏矿两次大的冒顶事故为资料背景,分析了矿柱、顶板系统的破坏机理。
With the two great roof-fall accident of Pingyi gypsum mine, this paper analyzes the stability of pillars and roof system and the mechanism of destruction of pillars and roof.
介绍了几种常见矩形矿柱及其优点,并对矩形矿柱的支撑效果进行岩石力学分析和评价。
This subject introduce some common rectangle ore pillars and its advantages, and rock mechanics analysis and evaluation of rectangle ore pillars support effects.
本文根据木架山的具体条件,提出了应用切顶与矿柱崩落联合法进行木架山采空场处理。
The method disposing abandoned stope is summarized, and it is proposed that the abandoned stope be disposed by roof cutting and pillar dilapidation.
采场的顶柱作为永久矿柱损失,采场底柱、间柱等采场大量放矿完毕后,一次性进行回收。
The crown pillar of stope is permanent loss and not recoverable, while sill pillar and barrier pillar shall be recovered after the ore drawing work is completed.
本文在岩石力学研究的基础上,对保安矿柱的作用进行了评价,提出其安全开采的一些建议。
In this paper based on principles of rock mechanics the roles of safety pillars in mining is evaluated. Some recommendations for their safe mining are provided.
准确掌握矿柱实际边界是矿柱回采爆破设计的基础,也是提高矿山经济效益的有效途径之一。
The accurate awareness of actual pillar boundary is the basis for the blast design for pillar extraction and is also one of the effective ways to improve the mine economic benefit.
通过改变扰动应力波峰值的大小,来考察动力扰动强度的变化对承受高应力矿柱稳定性的影响。
And then the effect of disturbance intensity on the stability of highly-stressed pillars is reflected by changing the different peak value of the dynamic stress wave.
通过改变扰动应力波峰值的大小,来考察动力扰动强度的变化对承受高应力矿柱稳定性的影响。
And then the effect of disturbance intensity on the stability of highly-stressed pillars is reflected by changing the different peak value of the dynamic stress wave.
矿柱的原声例句
矿柱的网络释义
矿柱 矿柱作为一种建筑工具广泛使用,主要靠围岩本身的稳固性和矿柱的支撑能力维护回采过程中形成的采空区,有的方法用其他支架或采下矿石作辅助或临时支护。
以上关于矿柱的英语翻译来自英汉大词典,希望对您学习矿柱的英语有帮助。